Commercial
Commercial Flooring Solutions
Heavy-duty epoxy, LVT and safety vinyl for Dubai offices, retail, restaurants.
Read ArticleSeamless, chemical-resistant resin floors for warehouses, garages, kitchens, retail and decorative villa interiors. Diamond-prepped, primer-bonded, expertly poured by certified resin applicators with a 15-year industrial warranty.
Diamond-prepped, primer-bonded, two-coat roller epoxy. Domestic garages, basements and store rooms. 3-day install.
Epoxy is a thermosetting resin: when the base resin and hardener are mixed at a precise ratio, they undergo an irreversible chemical reaction, curing in 8–24 hours into a tough, glass-clear, monolithic surface bonded directly to the concrete substrate.
Epoxy systems and safety-floor accessories — everything for industrial, commercial and decorative installs.
Epoxy isn’t one product — it’s a family of resin systems. Pick the right one for the substrate, the traffic, and the chemicals it’ll meet.
A specialist briefing on every system, from light garage epoxy to industrial PU hybrid — the full picture before you commission.
Epoxy is a thermosetting resin: when the base resin and hardener are mixed at a precise ratio, they undergo an irreversible chemical reaction, curing in 8–24 hours into a tough, glass-clear, monolithic surface bonded directly to the concrete substrate.
That seamlessness is the killer property. There are no joints for water, oil, chemicals, bacteria or dust to penetrate. Properly installed epoxy floors carry full chemical certifications for food production, pharmaceutical labs, automotive workshops, and any environment where contamination cannot be tolerated.
Light-duty garages, residential basements, storerooms. Diamond surface prep + bonding primer + 2 coats epoxy. AED 110–160/m².
Warehouses, retail, showrooms. Trowel-applied resin self-levels to perfectly flat finish. AED 180–260/m².
Villas, retail, bars, showrooms. Metallic pigments suspended in clear resin, manipulated for swirling marble-like effects. AED 280–450/m².
Mechanical workshops, factories. Coloured aggregate broadcast into wet resin gives anti-slip texture. AED 260–380/m².
Electronics labs, server rooms, MRI suites. Conductive resin with copper-strip grid. Surface resistance 10&sup6;–10&sup9; Ω. AED 320–500/m².
Commercial kitchens, food production. Heat & thermal-shock resistant, withstands boiling spills. AED 350–600/m².
Metallic epoxy is the only floor finish that produces a different result every time. Metallic pigments suspended in clear resin are manipulated with rollers, torches and air movement — the resin then cures, locking the swirl pattern in place forever.
In Dubai we’ve installed metallic epoxy in over 80 villas, 30+ retail spaces, several car showrooms and multiple boutique hotel lobbies. From minimal silver-grey marbled effects through to dramatic copper / charcoal / pearl combinations.
Epoxy is the lowest-maintenance floor we install:
Our crew is factory-trained on Sika, Mapei and Bostik systems. Mixing ratios, ambient conditions, application timing — all certified.
Every commercial install comes with chemical-resistance, fire (Bfl-s1) and ESD certificates as required.
For projects over 200m² we apply a 2m² test panel for colour and pattern sign-off before the full pour.
75,000+ m² poured across Dubai warehouses, factories, garages and showrooms.
Written, transferable, covers product and workmanship.
Annual inspection and 5-yearly top-coat refresh for high-traffic installations.
Moisture-test, hardness-test, flatness-test the substrate. Identify any contamination.
90 minMechanical diamond-grind to CSP 3–4 to expose porous concrete.
1 day / 200m²Epoxy bonding primer applied. Cures 8 hours — critical for top-coat adhesion.
8 hr cureMixed, poured, spike-rolled to release air. Aggregate or metallic added per system.
1 day / 300m²24h cure between coats. Final PU top coat for UV stability and chemical resistance.
7 days full
Commercial
Heavy-duty epoxy, LVT and safety vinyl for Dubai offices, retail, restaurants.
Read Article
Buying Guide
Guide
Free site survey within 48h. Written technical proposal. On-site sample panel for projects over 200m².